ACER REMIT Reporting for LNG Market

Practical guidance on REMIT reporting for LNG market participants — covering data collection via the TERMINAL platform, fundamental & transaction data rules, EU delivery scope, and ship unavailability disclosure.

What types of LNG reporting exist under REMIT?

For LNG, there are generally four relevant reporting areas:

  1. LNG Fundamental Data
    Reporting of technical and operational data related to LNG facilities, such as capacity, nominations, send-out, stock levels or other infrastructure-related information, depending on the applicable REMIT requirements.
  2. LNG Transaction Data
    Reporting of LNG supply contracts and related transactions under REMIT transaction reporting rules, usually via an RRM where the contract qualifies as a reportable wholesale energy product. (After 29 October 2027 it is expected that LNG market data will be reported via RRMs to ARIS. See Guideline on REMIT
    transaction reporting. p.29 §153)
  3. LNG Market Data
    Reporting of LNG market data to ACER, including relevant LNG transactions and, where applicable, firm bids and offers. This reporting is submitted via ACER’s dedicated TERMINAL platform and supports ACER’s LNG price assessment and benchmark.
  4. LNG Inside Information
    Publication of inside information related to LNG activities, for example unplanned outages, capacity restrictions or other events that may significantly affect LNG or gas markets. This is usually published via an Inside Information Platform.

1. Rules for LNG fundamental data

Market participants or LSOs on their behalf shall report to the Agency for each LNG facility the following information:

a) In relation to unloading and reloading of cargoes:

    • Data of unloading and reloading,
    • Volumes unloaded or reloaded pre ship,
    • The name of the terminal customer,
    • Name and size of the ship using the facility.

The market participant should provide to ACER the LNG Participant Activity Report (lngParticipantActivityReport). The LNG Participant Activity report contains details of all of the movement of LNG into and out of the facility by a market participant within a gas day.

LNG fundamental data relating to dates of unloading and reloading and volumes unloaded and reloaded per ship must be reported to the Agency by market participants no later than the working day following unloading or reloading.

b) The planned unloading or reloading at the LNG facilities in a daily resolution for the next month.

The report must specify the  market participant and name of the terminal customer (if different from the market participant).

The market participant should provide to ACER the LNG Planned Usage Report (lngPlannedUsageReport). To be provided in advance of the month to which it relates.
The planned usage report provides a monthly forecast of expected usage of the facility for the month ahead.

Links:
Manual of Procedures on transaction data, fundamental data and inside information reporting
FAQs REMIT fundamental data and inside information (See questions 3.2.5, 3.2.7, 3.2.8)

1.1 What changes for LNG terminal operators under REMIT?

Effective date What LNG terminal operators must do
29 April 2026 Continue reporting technical, contracted and available capacity, send-out, and LNG inventory to ACER at daily resolution, within two working days. For facilities operated as a group, report contracted and available capacity for the group. Report technical capacity, send-out, and inventory for each individual facility.
29 April 2026 Planned and unplanned outages no longer require a separate fundamental data report. Outages that qualify as inside information must still be published through an Inside Information Platform (IIP).
29 April 2028 The terminal operator becomes solely responsible for reporting actual and planned LNG cargo unloading and reloading. Until then, market participants can report these data themselves or have the operator report on their behalf. Actual operations must be reported within two working days. Planned operations must be reported before the start of the month they cover.

For operators that already report cargo data for all their customers, the main change in 2028 is legal responsibility. Where customers currently submit their own reports, the operator will need to incorporate those cargo data into its reporting process.

1.2 Do LNG terminal and gas storage outages still need to be reported after 29 April 2026?

Since 29 April 2026, planned and unplanned outages at LNG terminals and gas storage facilities no longer require a separate fundamental data report. Outages that qualify as inside information must still be published through an Inside Information Platform (IIP). (See OPEN LETTER for Regulation 2026/256 on Data Reporting §16)

1.3 What changes for LNG cargo reporting under REMIT on 29 April 2028?

From 29 April 2028, LNG terminal operators will be responsible for reporting LNG cargo data to ACER through a Registered Reporting Mechanism (RRM). Until then, the relevant market participants can report these data themselves or have the terminal operator report on their behalf. (See OPEN LETTER for Regulation 2026/256 on Data Reporting)

What must be reported? Deadline
Actual unloading or reloading of LNG cargoes, including the date, volume per vessel, terminal customer’s name, and vessel name and size Within two working days of the operation
Planned unloading or reloading for the following month, with a daily breakdown identifying the market participant and, if different, the terminal customer Before the start of the month covered by the schedule

These requirements are set out in Article 12(5) and (6) of Commission Implementing Regulation (EU) 2026/256. (See: EU Regulation 2026/256)

Gas storage operators will be solely responsible for reporting the volume of gas held in storage for each market participant. Terminal and storage customers will no longer submit these specific reports themselves.

Does the change also affect inside information?

Market participants continue to publish relevant inside information through an Inside Information Platform (IIP). From 29 April 2028, Article 13(2) requires the IIP to report the information published on its platform electronically to ACER on behalf of the market participant.

1.4 Who reports LNG cargo data before and after 29 April 2028?

NG cargo data are already subject to REMIT reporting. On 29 April 2028, legal responsibility for reporting these data shifts to the LNG terminal operator. (See: EU REGULATION No 1348/2014),  (DE: VERORDNUNG (EU) Nr. 1348/2014)

Until 28 April 2028 From 29 April 2028
Who reports? The relevant market participant reports the data itself, or the LNG terminal operator reports on its behalf. The LNG terminal operator is solely responsible for reporting and submits the data to ACER through a Registered Reporting Mechanism (RRM).
What is reported? Actual LNG cargo unloading and reloading, and planned operations for the following month. The same categories of LNG cargo data.
Legal basis Article 9(5) of Implementing Regulation (EU) No 1348/2014 continues to apply during the transition. Article 12(5) of Implementing Regulation (EU) 2026/256 applies.

When did the reporting deadline change? Since 29 April 2026, actual unloading and reloading must be reported within two working days of the operation. Previously, the deadline was the next working day. The schedule for planned operations remains due before the start of the month it covers.

Example. If a terminal customer currently reports its own LNG unloading data, the terminal operator takes over from 29 April 2028. If the operator already reports on the customer’s behalf, the submission process may stay the same, but the operator will be reporting to fulfil its own legal obligation.

(Links: regulation)

2. LNG Transaction Data

2.1 Rules for LNG transaction data

The reporting of contracts for the supply of liquefied natural gas (LNG) should not be different than any other contract for the supply of natural gas. Most of the contracts for the delivery of liquefied natural gas at EU LNG terminals are non-standard contracts.

We have two cases for reporting on LNG contracts:

A) If the contract does not have a defined quantity or price you need send two messages:

  • The contract of liquefied natural gas at EU LNG terminals is reportable with Table 2
    Deadline: within T+10 business days from the day the delivery into the EU was agreed (new REMIT2 reuirement).
  • When price and volume will be defined the contract should be reported with EXECUTION message Table 1.
    Deadline: within 1 month from the day when price and volume are known.

(Please see FAQ, Question 3.1.2, 3.1.21,  3.1.22, 3.1.24, 3.1.49)

B) If the non-standard contact has a defined (fixed) price and quantity.

This should be reported with: Table 1 for Non-Standard BILCONTRACT contracts with outright price and volume for the contract (as per normal pipeline gas supply contracts with outright price and volume).
Deadline: the contract should be reported within T+10 business days (new REMIT2 reuirement)
(Please see -> FAQ, Question 3.1.22 -> Scenario 6)

Any changes between the contractual volume and the final delivery volume should be reported as a lifecycle event with Action type “M” for Modify.
Deadline: within 1 month from the when price and volume are changed.

2.2 LNG reporting scenarios

Contract outside of EU

Contracts for the supply of LNG before the entry flange of an EU LNG regasification terminal are not subject to transaction reporting. (For example an exchange of title on the high seas outside the EU.)

Cargos traded under such contracts are subject to the reporting of fundamental data provided once the cargo is unloaded at an EU LNG regasification terminal.
If the cargo – once bought on the high seas
outside the EU under this type of contract is re–traded by the buyer at or after the entry flange of an EU LNG regasification terminal, then the transaction related to the new contract will be subject to reporting.
(FAQ, Question 3.1.21)

Transportation Contract

The transportation contract from the regasification terminal to the gas terminal does not need to be reported. There are currently no requirements for the reporting of transportation contracts involving locations that are not balancing zones.
(FAQ, Question 4.2.20, 3.1.22 – 3.1.26, 3.1.49)

Virtual Gas Storage Contract

Are Virtual Gas Storage contracts reportable under REMIT?
Insofar as virtual gas storage contracts are not contracts for the supply (or transportation) of natural gas, they are not reportable under REMIT.
However, contracts for the supply of natural gas within storage and LNG facilities are reportable contracts. For instance, when market participant A sells gas to market participant B within a storage or LNG facility, transferring the ownership of the gas, this is a reportable contract.
(Questions and Answers on REMIT, Question 1.1.8)

Contract with Delivery in the Union

Are contracts for the supply of liquefied natural gas (LNG) with delivery in the Union covered by the scope of REMIT?
Contracts for the supply of LNG, where delivery is in the Union, are wholesale energy contracts pursuant to Article 2(4)(a) of REMIT.
(Questions and Answers on REMIT, III.3.34)

Delivery of LNG into the European Union

What constitutes delivery of LNG into the European Union?
As far as liquefied natural gas (LNG) contracts are concerned, the Agency considers any importation or offloading of liquefied natural gas in any LNG facility (including flanges that connect the LNG vessel to the LNG terminal) as ‘delivery in the Union’ as far as the delivery of the product takes place in the European Union.
In the situation described above, assuming the delivery of the liquefied natural gas is in the European Union, both parties to the contract will need to register with the relevant National Regulatory Authority/ies as the contract is reportable to the Agency.
Reload-contracts at a regasification terminal or at a vessel where the delivery of the product is not the European Union are not reportable.
(Questions and Answers on REMIT, III.3.36)

Note:

EIC W

The EIC W code of LNG terminal or a gas storage facility is the reporting of the delivery point.

Agency has indicated that where the gas is delivered at an LNG or a gas storage facility, then the EIC W code for that facility should be reported.
(FAQ on transaction reporting, Question 2.1.42 )

Delivery Point

The reporting of contracts for the supply of liquefied natural gas (LNG) should not be different than any other contract for the supply of natural gas. The only difference between a contract for the supply of natural gas at a balancing area and the contract for the supply of liquefied natural gas at the LNG terminal is the reporting of the delivery point.

While market participants have to use EIC Y code for reporting the delivery of natural gas at balancing areas,
EIC W code should be used when the delivery is in the LNG terminals.
(FAQ, Question 3.1.2)

Delegate the Reporting Obligation

Are RRMs allowed to report fundamental data directly to ACER on behalf of market participants for “Unloading and Reloading of LNG” and for “Amount of gas stored”?
The market participants can delegate the reporting obligation to LSO/SSOs respectively or to any other registered RRM.
(Questions and Answers on REMIT, III.4.2)

2.3 Contract for the delivery of LNG in EU

The key element of the geographical scope is that a delivery point of such electricity or natural gas must be in the EU.

On the contrary, contracts for the supply of electricity or natural gas produced/generated outside the EU but delivered within the EU borders will be under the scope of REMIT.

Example: Situation: Bilateral over-the-counter contract for the delivery of LNG at the OLT offshore LNG terminal of Toscana (Italy).

The product is delivered in the EU – the LNG is delivered in EU territorial waters (Italian territorial waters – EU member state). It is not relevant for the qualification of the delivery as being in the EU if it is on an offshore or on onshore facility. As far as the contracts for the LNG supply are concerned, the Agency considers any delivery or offloading of LNG in any LNG facility (including flanges that connect the LNG vessel to the LNG terminal) as ‘delivery in the EU’ as long as the delivery of the product takes place in the EU.

ACER_Guidance_on_REMIT_application_6th_Edition_Final.pdf (europa.eu), Page 20

2.4 Gas transportation contracts for delivery at the EU border

The concept of ‘transportation of electricity or natural gas’ in the EU shall be interpreted by NRAs as including at least one bidding zone/delivery point located inside the EU:

  • all transportation of electricity or natural gas (including LNG) between bidding zones or specific delivery points that are (totally or partially) geographically located in the EU territory;
  • all transportation of electricity or natural gas (including LNG) from a bidding zone or point that is geographically located outside of the EU to a bidding zone or delivery point located (totally or partially) inside the EU;

Example: Gas transportation contract for delivery of natural gas at the EU border

Situation: A market participant bought yearly firm transportation capacity of natural gas so that it can import natural gas from Russia into the EU (the contract stipulates that the entry point is in a Russian location and the delivery point is at the border between Ukraine and Slovakia).

Assessment: This contract is a wholesale energy product pursuant to Article 2(4)(c) of REMIT, as it fulfils all relevant criteria:

  • It is related to that transportation in the EU – the delivery point of the natural gas to be transported is the border between Slovakia and Ukraine that is partially located in the EU (as Slovakia is the EU Member State while Ukraine is not).

ACER_Guidance_on_REMIT_application_6th_Edition_Final.pdf (europa.eu), Page 21

2.5 Who shall report?

In accordance with Article 8 of REMIT, market participants, or a person or authority on their behalf, shall provide the Agency with a record of wholesale energy market transactions, including orders to trade.

Reporting obligations cover:

a) market participants, which means any person, including transmission system operators, who enters into transactions, including orders to trade, in one or more energy markets. Entities entering into transactions via third parties (e.g. via a Direct Market Access service) are also considered market participants;
b) third parties acting on behalf of market participants (e.g. OMP members offering a Direct Market Access service);
c) trade reporting systems;
d) organised market places, trade matching systems or other persons professionally arranging transactions;
e) trade repositories registered or recognised under Regulation (EU) No 648/2012 (EMIR);
f) competent authorities which have received the information in accordance with Article 25(3) of Directive 2004/39/EC (MiFID) or ESMA when received in accordance with Regulation (EU) No 648/2012 (EMIR).

The Agency expects that market participants under REMIT may enter into transactions:

a. acting on their own account and on their own behalf (pure principal transaction – i.e. on the decision of the firm);
b. acting on their own account and on behalf of a client – i.e. on the order of other market participant; and/or
c. acting on the account and on behalf of a market participant (pure agency transaction)
d. acting on a third entity’s account and on their own behalf

3. LNG Market Data

3.1 What is the difference between LNG data reporting and the ACER TERMINAL platform?

  • LNG supply contracts are reportable under REMIT transaction reporting rules.
  • TERMINAL is separate from normal REMIT transaction reporting via an RRM.
    LNG market data reporting via TERMINAL is a specific reporting stream used for ACER’s LNG price assessment and benchmark.
    ACER publishes a daily LNG price assessment and benchmark based on reported data, ensuring market transparency.


    Important change: Due to the new, revised REMIT Implementing Regulation, registration and reporting via the standalone TERMINAL system is expected to be discontinued in October 2027. For further information and formal reporting requirements, please visit the ACER REMIT Portal.

3.2 LNG Market Data – Same-day reporting

Under REMIT II, reporting requirements are being strengthened. Market participants are expected to submit certain LNG transaction data on the same day (by 18:00 CET), with future integration into Registered Reporting Mechanisms (RRMs).

See -> §6.1. Timing of reporting of LNG market data to ACER

3.3 How will LNG market data reporting change on 29 October 2027?

LNG market participants will continue to report via TERMINAL through 28 October 2027. From 29 October 2027, they will submit LNG market data to ACER’s REMIT Information System (ARIS) through a Registered Reporting Mechanism (RRM), using the new electronic format based on Table 1 of the revised REMIT Implementing Regulation. (See OPEN LETTER for Regulation 2026/256 on Data Reporting §12)

4. Inside Information Platform

4.1 Do we need to report information about unavailability oder restriction of the LNG ship on Inside Information platform?

The information about the unavailability or restrictions of the LNG vessel should be reported on the Inside Information platform.

This information is crucial to ensure transparency and provide market participants with the necessary data to make informed decisions.
Failure to report such unavailabilities or constraints could lead to market disruption, lack of transparency and potentially non-compliance with regulatory requirements.

Please use the ‘Other market information’ UMM data type to disclose such messages related to LNG ships.

Authoritative references

Note: This FAQ collection has been compiled from various sources and reflects our understanding. It is provided for informational purposes only and is not legally binding. We do not take any legal responsibility for the accuracy or completeness of the information. For legal or regulatory matters, please consult a professional.

ACER REMIT Reporting
Privacy Overview

This website uses cookies so that we can provide you with the best user experience possible. Cookie information is stored in your browser and performs functions such as recognising you when you return to our website and helping our team to understand which sections of the website you find most interesting and useful.