The European Union Agency for the Cooperation of Energy Regulators (ACER) has published its 46th REMIT Quarterly Report. The report summarises the most important developments in the monitoring of European wholesale energy markets, REMIT reporting obligations and the publication of inside information during the third quarter of 2026.

The main topics include the new REMIT Reporting Guidelines published on 29 October 2026, including TRUM 8.0, the gradual introduction of additional reporting obligations, the monitoring of algorithmic trading activities and preparations for the new authorisation procedure for Registered Reporting Mechanisms (RRMs) and Inside Information Platforms (IIPs).

Below, we summarise the most important findings and their practical implications for market participants and reporting service providers.

Original report: ACER REMIT Quarterly Q3 2026 – Download PDF


Key Findings at a Glance

IndicatorQ3 2026
REMIT cases under investigation536
Active market participants on organised marketplaces2,924
Reported contract volume66,751 TWh
Natural gas trading volume56,854 TWh
Electricity trading volume9,897 TWh
Reported cases of suspicious behaviour over the rolling 12-month period44

1. New REMIT Reporting System – Three Implementation Phases

One of the most important developments is the publication of the first package of revised REMIT reporting documents on 29 October 2026.

Following the revision of the REMIT Regulation in 2024 and the adoption of the new Implementing Regulation (EU) 2026/256 and Delegated Regulation (EU) 2026/255, the requirements for data reporting are being introduced in several stages.

ACER has established three implementation phases:

Phase 1 – 2027

The first documentation package was published on 29 October 2026. It covers:

  • Exposure Reporting – reporting of trading positions and exposures.
  • Continuous reporting of electricity and natural gas supply contracts.
  • Continuous reporting of electricity and natural gas transportation contracts.
  • LNG market and trading data.
  • Periodic reporting of contracts with energy-intensive consumers.

Important distinction regarding application dates: Exposure Reporting under Article 6 of Implementing Regulation (EU) 2026/256 already applies from 1 January 2027. The other key requirements of the first implementation phase apply from 29 October 2027.

Phase 2 – 29 April 2028

The publication of the corresponding ACER guidelines is scheduled for 29 April 2027.

The second phase covers:

  • Additional periodic reporting obligations.
  • Transactions executed through trade-matching systems that are not classified as organised marketplaces.
  • Reporting of fundamental data.
  • Reporting of inside information.

Phase 3 – 1 July 2028

The third phase concerns reporting obligations relating to hydrogen:

  • Hydrogen supply contracts.
  • Hydrogen transportation.
  • Hydrogen storage.

The corresponding ACER guidelines are scheduled for publication on 29 October 2027.

Relevant legal acts and documents:

2. TRUM 8.0 – Comprehensive Update of Transaction Reporting

On 29 October 2026, ACER published version 8.0 of the Transaction Reporting User Manual (TRUM).

The updated manual provides technical and operational instructions for reporting wholesale energy transactions and LNG market data under the revised REMIT framework.

TRUM 8.0 is structured into a main document and three annexes:

DocumentContent
TRUM 8.0 – Main DocumentTechnical reporting requirements and data fields
Annex ILifecycle Event Reporting
Annex IIExamples of transaction reporting
Annex IIIReporting of LNG market and trading data

The new TRUM particularly addresses the following reporting areas:

  • Table 1 – Standardised supply contracts, including LNG market data.
  • Table 2 – Non-standardised supply contracts.
  • Table 3 – Electricity transportation contracts.
  • Table 4 – Natural gas transportation contracts.

New Guideline on REMIT Transaction Reporting

In addition to the TRUM, ACER has published a new consolidated Guideline on REMIT Transaction Reporting.

It separates the regulatory and substantive explanations from the technical reporting instructions. In particular, the Guideline explains who must report which data, when a reporting obligation arises and how key terms should be interpreted.

A particular focus is placed on Organised Marketplaces (OMPs) and the definition of the scope of reporting obligations.

The Guideline is supplemented by a separate annex covering the reporting of energy derivatives under REMIT and EMIR.

The new documentation is intended for the respective future application dates. Until 29 October 2027, market participants must continue to follow the existing requirements for transaction reporting, particularly TRUM 7.0 and the 17th edition of the FAQs.

3. 536 REMIT Cases Under Investigation

At the end of the third quarter of 2026, ACER reported a total of 536 potential REMIT violations under investigation. At the end of the second quarter, the figure was still 453 cases.

PeriodNew casesClosed casesCases under investigation
Q4 20255442456
Q1 20264548453
Q2 20265555453
Q3 202612138536

The 536 cases represent potential violations reported to ACER by external parties or identified through its own market monitoring activities. They should not be equated with confirmed legal violations. Following an investigation, a case may also be closed without sanctions.

During the third quarter of 2026, a sanction decision by the Italian regulatory authority ARERA against A2A S.p.A. for market manipulation under Article 5 REMIT was published. The fine amounted to EUR 5 million. According to ACER's table, the decision was subject to appeal.

Reports of Suspicious Behaviour

During the rolling 12-month period from 1 October 2025 to 30 September 2026, ACER informed the competent national regulatory authorities of a total of 44 cases of suspicious behaviour.

The reports included preliminary assessments and additional information concerning potential REMIT violations. ACER shares such information with the competent national regulatory authorities depending on the national market concerned and the registration of the market participant.

ACER – Overview of REMIT Cases and Sanction Decisions

4. Erroneous Trading Orders – Recent REMIT Enforcement Cases

The quarterly report contains a detailed analysis of three cases involving erroneous trading orders in Finland, Latvia and Lithuania.

These cases demonstrate that erroneous trading orders may, under certain circumstances, constitute market manipulation under Article 5 REMIT – even if there was no intention to manipulate the market.

Finland – Kinect Energy Sweden AB

An incorrect configuration of a wind forecasting system resulted in a sell order being submitted with a volume significantly exceeding the company's actual generation capacity.

The order had an average volume of approximately 5,787 MW per hour. The Finnish regulatory authority found that prices subsequently dropped sharply, reaching an average of EUR -203.40/MWh and falling to as low as EUR -500/MWh for ten hours.

The Finnish authority proposed a fine of approximately EUR 9.25 million. The final decision on whether to impose the penalty and its amount rests with the Finnish Market Court.

Latvia – Latvenergo AS

An employee entered a trading volume with an incorrect sign. As a result, electricity was offered for purchase instead of sale.

The Latvian regulatory authority found that the erroneous orders generated false and misleading market signals. The company received a fine of EUR 5,401. The early self-reporting, cooperation with the authority and corrective measures taken were considered mitigating circumstances.

Lithuania – Litgrid AB

The Lithuanian transmission system operator Litgrid submitted an erroneous sell order for 410 MWh for a single trading hour, even though the corresponding delivery capacity was not available.

The regulatory authority found that the order contributed to electricity scarcity and affected the Baltic balancing energy market as well as balancing energy and imbalance prices.

Litgrid received a fine of EUR 21,500.

Implications for Market Participants

These three cases highlight the importance of appropriate control mechanisms to prevent erroneous trading orders:

  • Automated checks before order submission.
  • Plausibility checks for prices and trading volumes.
  • Internal approval and monitoring procedures.
  • Employee training.
  • Controls for algorithmic trading systems.
  • Documented procedures for correcting erroneous orders.

The absence of an intention to manipulate the market does not automatically exclude a violation of Article 5 REMIT.

In this context, ACER refers to its Guidance on REMIT Application, 6.1st Edition.

5. Algorithmic Trading – Increasing Importance for Market Monitoring

ACER continues to investigate the growing importance of algorithmic trading in European wholesale energy markets.

An analysis of preliminary assessments from January 2020 to June 2026 shows:

  • Algorithmic trading was involved in approximately 60% of the preliminary assessments submitted to national regulatory authorities.
  • In approximately 55% of these situations, algorithms were instrumental in successfully executing the behaviour in question.
  • Algorithmic trading played a role in approximately 70% of the analysed potential cases of market manipulation under Article 5 REMIT.

Particularly noteworthy is that more than 80% of the alerts generated by ACER over the past six years originated from market environments with a high level of algorithmic trading activity.

The number of alerts generated has increased approximately fivefold compared with 2020.

Approximately 75% of the alerts prioritised and assessed by ACER were also associated with a high presence of algorithmic trading.

In this context, ACER identifies the following potentially manipulative trading practices in particular:

  • Wash Trades
  • Layering
  • Spoofing
  • Painting the Tape
  • Momentum Ignition
  • Quote Stuffing

ACER emphasises that market monitoring remains technology-neutral. The decisive factor is the potentially manipulative behaviour, regardless of whether trading activity is carried out manually or automatically.

6. Inside Information Platforms (IIPs) – Monitoring and the New Authorisation Procedure

During the third quarter of 2026, ACER continued monitoring the operation and performance of registered Inside Information Platforms.

Particular attention was paid to the following areas:

  • Reliability and availability of published inside information.
  • Accuracy and consistency of published data.
  • Technical accessibility of information.
  • Performance of web feeds.
  • Technical and operational publication processes.

ACER also improved the provision of information through the REMIT Portal and the ACER Inside Information Access Point, which provides centralised access to published inside information from various IIPs and transparency platforms.

Current European IIP Landscape

At the end of the third quarter of 2026, the ACER list included a total of 23 platforms, comprising 15 registered IIPs and eight transparency platforms.

CategoryNumber
Registered IIPs15
Transparency platforms8
Platforms providing electricity information18
Platforms providing natural gas information15
Platforms covering both energy commodities10

The registered IIPs include established exchanges and commercial service providers such as EEX, Nord Pool, HUPX, GME and TGE, as well as specialised infrastructure platforms such as JAO and PRISMA.

New Requirements and Authorisation Deadlines

Delegated Regulation (EU) 2026/255 introduces a formal authorisation and supervision procedure for IIPs and RRMs. It replaces the previous registration procedure.

The requirements cover, among other things:

  • Reliable and secure operations.
  • Data quality and validation.
  • Access to the services offered.
  • Operational resilience.
  • Organisational and technical arrangements.

The key milestones are:

  • 29 October 2027: The main provisions of the new authorisation and supervision framework become applicable. Companies may begin submitting authorisation applications from this date.
  • 29 April 2028: Existing registered IIPs wishing to continue their operations must submit an authorisation application by this date.

Existing registered IIPs may continue operating under their current registration until ACER has reached a decision on their authorisation application.

Existing service providers should review their organisational, technical and operational structures at an early stage and prepare the evidence required for the new authorisation procedure.

ACER Open Letter of 9 April 2026 – Implications of Delegated Regulation (EU) 2026/255

7. REMIT Data Reporting and RRM Contingency Reports

ACER collects more than 100 million transaction records every day through its REMIT Information System (ARIS).

The quality, completeness and timely submission of this data are essential for European market monitoring.

RRM Contingency Reports

In each quarterly report, ACER publishes information about so-called Contingency Reports. These are notifications submitted by a Registered Reporting Mechanism to ACER regarding problems with data reporting, for example:

  • Delayed reporting.
  • Temporary interruptions of the reporting service.
  • Identified data quality issues.
  • Problems collecting data from market participants.

In the third quarter of 2026, most relevant contingencies concerned the following scenarios:

  • Scenario 3: The RRM is still undergoing the registration process and has not yet completed the identification phase. Consequently, it cannot submit data to ARIS.
  • Scenario 4: A registered RRM experiences a temporary interruption of its reporting service lasting less than one week.
  • Scenario 6: A registered RRM is unable to collect data from its market participants.

ACER particularly highlights that the majority of contingencies addressed during the third quarter concerned interruptions in data collection between RRMs and their market participants.

The Agency will continue monitoring the ability of RRMs to collect data reliably and will follow up on updates to outstanding contingency reports.

For market participants, this underlines the importance of stable technical interfaces, reliable data transmission and clearly defined procedures for disruptions and subsequent reporting.

Discontinuation of the Previous List of Standard Contracts

In connection with the new Implementing Regulation, ACER also indicates that the previous list of standard contracts will no longer be updated.

The list was last updated for the first quarter of 2026. The corresponding section of the REMIT Portal was scheduled to be removed in November 2026. ACER reserves the right to publish a new ex-post overview of standard contracts traded on organised marketplaces in the future, based on reported REMIT transactions.

8. European Energy Trading – Q3 2026 Statistics

In the third quarter of 2026, the reported contract volume on organised marketplaces reached a total of 66,751 TWh.

This represents an increase of 8.9% compared with the third quarter of 2025 and an increase of 1.4% compared with the second quarter of 2026.

CommodityQ3 2025Q3 2026
Electricity8,375 TWh9,897 TWh
Natural gas52,922 TWh56,854 TWh
Total61,297 TWh66,751 TWh

Key developments:

  • Electricity forward trading: increase of 20.0%.
  • Electricity intraday trading: increase of 18.9%.
  • Total number of active market participants: 2,924, an increase of 266 compared with Q3 2025.
  • Active market participants in electricity trading: 2,476.
  • Active market participants in natural gas trading: 1,120.

Natural gas markets continued to account for the largest contract volumes, while electricity markets recorded the highest number of active market participants.

The reported trading volumes represent the sum of purchased and sold contract quantities and should therefore not be equated with actual physical energy consumption.

Changes to Reference Lists

At the end of the third quarter of 2026, the ACER list included a total of 76 Organised Market Places (OMPs).

  • Austrian Power Grid AG was newly added.
  • SPX, s.r.o. was removed from the list.

Regarding the list of accepted EIC codes, one application for inclusion was rejected, while one application for removal of a code was accepted. Transactions using the Delivery Point EIC 21Z000000000119U will continue to be accepted until 31 March 2027.

The updated list of accepted EIC codes was published on 25 September 2026.

ACER – Reference Lists, OMPs and Accepted EIC Codes

9. What Should REMIT Market Participants Do Now?

The developments highlighted in the latest ACER Quarterly Report give rise to several practical areas of action.

Transaction Reporting and Data Quality

  • Review TRUM 8.0 and the new Reporting Guidelines.
  • Assess the implications of the three implementation phases.
  • Review existing data structures and reporting interfaces.
  • Prepare for Exposure Reporting and the new requirements for continuous reporting.
  • Review Lifecycle Reporting and procedures for corrections and cancellations.

Compliance and Trading Controls

  • Review control procedures before order submission.
  • Implement automated plausibility checks.
  • Ensure that trading decisions and order modifications are properly documented.
  • Establish appropriate controls for algorithmic trading systems.

Inside Information and Reporting Infrastructure

  • Review publication processes for inside information.
  • Ensure the reliability and accessibility of UMM publications.
  • Take the new authorisation requirements for IIPs and RRMs into account.
  • Review technical interfaces between market participants and reporting service providers.
  • Establish procedures for reporting interruptions and data corrections.

10. ACER Webinar on 23 November 2026

On 23 November 2026, ACER will host a webinar to present the first package of revised REMIT Reporting Guidelines.

The main topics will include the new transaction reporting requirements, Exposure Reporting and the practical implementation of the first implementation phase.

ACER Webinar – New REMIT Data Reporting Guidance, 23 November 2026

Conclusion: REMIT Compliance Is Becoming Increasingly Data- and Technology-Driven

The 46th ACER REMIT Quarterly Report demonstrates that the European REMIT framework is entering an important implementation phase.

The publication of TRUM 8.0, the introduction of Exposure Reporting, the new requirements for continuous data reporting and the upcoming authorisation procedure for RRMs and IIPs require adjustments to technical and organisational processes.

At the same time, ACER's findings on algorithmic trading, erroneous trading orders and RRM contingency reports highlight the growing importance of reliable control mechanisms, high data quality and stable reporting infrastructure.

Market participants and service providers should therefore begin preparing for the upcoming regulatory changes in good time.

How Webware Supports REMIT Compliance

Webware supports European energy market participants in meeting their REMIT reporting and publication obligations.

Our services include:

  • Registered Reporting Mechanism (RRM): Submission of transaction and fundamental data to ACER and ElCom.
  • Inside Information Platform (IIP): Publication of inside information and Urgent Market Messages (UMMs).
  • Market Participant Registration: Assistance with CEREMP registrations and regulatory requirements.
  • Reporting Interfaces: Data exchange via API, SFTP and web portal.
  • Representative Services: Support for market participants established outside the EU.

With our platforms, market participants can manage their reporting and publication obligations through a centralised technical infrastructure.

Further information:


Official Sources and Further Documentation

Note: This News collection has been compiled from various sources and reflects our understanding. It is provided for informational purposes only and is not legally binding. We do not take any legal responsibility for the accuracy or completeness of the information. For legal or regulatory matters, please consult a professional.

ACER REMIT Reporting
Privacy Overview

This website uses cookies so that we can provide you with the best user experience possible. Cookie information is stored in your browser and performs functions such as recognising you when you return to our website and helping our team to understand which sections of the website you find most interesting and useful.