• Home
  • News-en
  • INSTRUCTIONS FOR REMIT REPORTING OF GAS DATA RELATED TO DELIVERY IN GERMANY AS OF 1 OCTOBER 2021

The gas transmission system operators (TSOs) and the two market area managers GASPOOL Balancing Services (GASPOOL) and NetConnect Germany (NCG) have announced the merger of their market areas into Trading Hub Europe (‘THE’) on1 October 2021. For the purposes of REMIT reporting, the single German gas market area THE will be identified with one Energy Identification Code (EIC), i.e. 37Y005053MH0000R

In line with the indications provided in the Annex VI of TRUM that states a preference for the EIC type Y code, ACER intendsto include the Y-code of the new market area in the List of Accepted EICs.

According to the quarterly update of the List of Accepted EIC code, the inclusion of the new EIC in the List of the Accepted EICs will take place by the end of September 2021. The inclusion of the new EIC code assigned to the single German gas market area in the List of Accepted EICs will not imply the immediate deletion of the EICs now assigned to the existing marketareas operated by GASPOOL and NCG. The existing EICs will be still included in the List of Accepted EICs after October 2021 for a period of 6months. MPs will be able to report with GASPOOL  and NCG codes during this interim period.

 

Gas Market Area EICGas Market Area NameTSO NameCountry CodeCountryEL/NG
37Y701133MH0000PMarktgebiet GASPOOLGASPOOLDEGermanyNG
37Y701125MH0000IMarktgebiet NetConnectNetConnectDEGermanyNG
37Z701133MH0000BVHP GASPOOL HgasGASPOOLDEGermanyNG
37Y701130ML0000PVHP GASPOOL LgasASPOOLDEGermanyNG
37Z701125MH00004Marktgebiet HGas NetConnecNetConnectDEGermanyNG
37Z701125ML0000HMarktgebiet LGas NetConnectNetConnectDEGermanyNG

 

Once the interim period of 6 months expires, at the end of Q1 2022, the following 6 EICs will be deleted from the List of Accepted EICs, and therefore should not be used for the reporting under REMIT.

ACER will inform stakeholders well in advance of the upcoming deletion of the EICs in the excel file “List of Accepted EICs Table 1_and_2” available on the REMIT portal under the Annex VI of TRUM.

Details of reporting of transactions

A.   For REMIT Reporting of Standard and Non-Standard Contract:

  1. All new REMIT-reportable contracts(including Standard and Non-Standard contracts)concluded on or after1 October 2021 will have to be reported with the EIC of THE, i.e. 37Y005053MH0000R
  2. The outstanding REMIT-reportable contracts concluded before 1 October 2021, and thus affected by the consolidation of the market areas, do not require the reporting of lifecycle events, such as early termination or modification of the outstanding contracts, as triggered by the introduction of the new market area.

B.   For REMIT reporting of executions of both outstanding Non-Standard Contracts(concluded prior to 1 October 2021)and new Non-Standard contracts concluded after 1 October 2021:

  1. Executions of outstanding non-standard contracts with delivery start date on 1 October 2021 and on wards shall populate Field (48) Delivery Point of Zone of Table 1 with the EIC of  THE, i.e. 37Y005053MH0000R.
  2. For executions of new non-standard contracts concluded after 1 October 2021, the indication provided in A.1. applies.
Summary
Article Name
INSTRUCTIONS FOR REMIT
Description
For the purposes of REMIT reporting, the single German gas market areaTHEwill be identified with oneEnergy Identification Code (EIC),i.e.37Y005053MH0000R
Publisher Name
Webware Internet Solutions GmbH
Publisher Logo